
Arena Flooring Upgrade
Big things are happening at the Arena! The Town is replacing the old, damaged flooring in the hallways and changerooms with brand-new rubber flooring. After carefully preparing the surface and removing the old flooring, the new installation will improve safety and boost the overall look and feel of these high-traffic areas.
The project is in progress, and we’re aiming for completion by mid-April 2025. We can’t wait for you to see the amazing results!